Facilities

 To find the field just follow the Rainbow

https://www.youtube.com/watch?v=Mmh5SfjSTLM&feature=youtu.be

Current Facilities at the N.A.A.S field

 1. Easy access to field from N.A.A.S road (Purpose build entrance)
2. 180 meter flat,  grass air strip.
3. Several very large open flying area’s.

Aircraft can land on flat ground anywhere on the field if required.

4. No obstacles within flying area.
5. Over 1000ft from any roads.
6. No enforced noise restrictions.
7. 1000ft minimum height
8. Slope souring  and thermal gliding locations.
9.  Prevailing wing non turbulent and straight up the strip.
10. Large Pit area
11. 7 x Trees shading the pit area (7-8 meter plane trees)

12. Hot shower facilities.

13,. Toilet facilities at the feild.
14. Close to Canberra, 8 Kms from Tharwa bridge.
15. Shop located at Tharwa  township (General store.)
16. Public toilets at Tharwa visitors center 7 Kms from field.
17. Club house .
18. Pit and spectator shade facilities.

19. Flight control box

19. BBQ facilities.

20. Camping and bunkhouse dorm rooms that sleep 8 people in each. There is a bathroom and toilet attached to the rooms. (These are located 7km from the field at Outward bound see accomodation tab for more details)

21. Small local shop at Tharwa approx 8 kms.

 

 

 

 

 

 

Comments

250078's picture

Initial field area June 2013.

The foundations of a dream.

 

 

 

250078's picture

Planting of the Squadron of plane trees  for Pit and spectator shade.

1 meter by 1 meter and one meter holes had to be dug in 40 deg heat.

The trees toom a lot of watering.

1000 litre at a time.

These are 8 meter Paln trees and will offer great shade in the years to come

January 2014

Heavy Machinary

 

 

This is how it is done

 

Some hard stuff here

 

How many does it take to dig a hole??

Dave hard at work

 

 

 

The first N.A.A.S BBQ (no sausages) kindly provided by Tim

 

 

 

 

 

 

Photos taken by Stan on Sunday 16 Feb 2014 after some heavy rain.

These photos are about 3 weeks after the trees were plantes

 

 

 

 

 

 

 

 

 

 

 

250078's picture

FIRST FLYING DAY  DATE:    /2013

 

 

 

 

 

 

 

 

 

 

 

 

 

 

250078's picture

Proposed field layout

 

Proposed Club house and viewing/shade area

 

 

 

N.A.A.S Office is the same but with the door the other way around

 

 

Concept of internal facilities:- What do you think?

 

Pits/ Shade area

250078's picture

We have NAAS HQ 28 of February 2014

Layout version 2.1.2.1.1.234..5...a

 

 

Delivery by sheds are us

 

 

 

 

 

 

 

 

 

 

Forman checking alignment to with +/_ one micron

 

 

This will just need a womans touch

 

 

250078's picture

This is how we start the working day at N.A.A.S.

The conditions at N.A.A.S can be pritty difficult to get used to.

It has taken these two several seconds.

 

 

 

Shade and viewing platform taking shape

What a vista, Hasta la vista

 

 

Flight control tower going in.

The framing will be remove providing a viewing platrform and shade area.

BBQ area being positioned

I'm Love it. The Genie nodds and it is all done.  No "Communication" needed here"

Only  out by 0.5 mm

 

250078's picture

 

Front view still with intenal not removed

 

 

 

 

 

 

 

I think there is enough room to land a 380 Air bus

 

 

 

250078's picture

New color scheme for the shade area at the NAAS facility

 

 

 

250078's picture

Dave loves to Wow it, Mow it.

You can also see the NAAS weed spraying apparatus being tested.

 

250078's picture

Freshly mowed strip, 2 February 2015

You can just see Stan in the middle of the 100 meter wide strip, he is just a dot

250078's picture